By the NGOs.ke Editorial Team.
A logframe and a theory of change are not rivals. A theory of change explains how and why you expect change to happen. A logframe is the matrix that pins down what your project will do and how you will measure it. Most Kenyan NGOs applying for grants in November 2026 need both: the theory of change to think clearly, the logframe because many donors still ask for one.
What is the difference between a logframe and a theory of change?
The development-practice site tools4dev describes a logframe as a tool for planning, monitoring and evaluating a project, laying out the links between activities, outputs, outcomes and impact. A theory of change, in its words, is a conceptual framework describing how and why an intervention is expected to lead to the results you want.
| Logframe | Theory of change | |
|---|---|---|
| Main job | Plans and tracks a specific project | Explains how change is expected to happen |
| Format | A matrix (goal, outcomes, outputs, activities, indicators, risks) | A diagram, often with a short narrative |
| Scope | One project or grant | Wider than any single project |
| Assumptions | Listed as risks or assumptions per level | Central: every step rests on one |
| Best used for | Reporting, budgeting, monitoring | Strategy, learning, designing programmes |
Do you need both for a grant application?
Often, yes. INTRAC’s guide for small and diaspora NGOs, written by Cathy James, says the two tools are not mutually exclusive. Many NGOs find it easier to draw up a logframe once they have worked through a theory of change, because the theory surfaces the logic and the logframe records the specifics. Others find a theory of change fits their way of working so well that they drop the logframe entirely, though that depends on what your donor will accept.
The practical rule: read the call for proposals. If the application template contains a results framework or logframe table, you will fill one in. If it asks for a “theory of change” or “pathway to impact”, you will need a narrative or diagram. Some ask for both.
How do you build a simple theory of change?
Start from the change you want, then work backwards. INTRAC’s guide stresses that a theory of change is a process of reflection, not a document written to impress funders, and that it should start with the people you work with. One participant quoted in the guide admitted their first attempt, built to please donors, started from the wrong place.
- Name the long-term change. For example, fewer girls dropping out of school in your sub-county.
- Work backwards. What must change just before that? Keep asking until you reach what your organisation does directly.
- Write down every assumption. “Parents will let girls attend if fees are covered” is an assumption you can test.
- Check it with the community. If the people you serve disagree with a step, the step is wrong.
- Note what else is influencing change. Other actors, government programmes and local norms all count.
How do you turn that into a logframe?
Take the theory of change and lift out the part your grant will fund. Each row of the logframe then maps to a step you have already reasoned through.
- Goal or impact: the long-term change your project contributes to.
- Outcomes: the changes in behaviour, practice or conditions you expect by the end of the grant.
- Outputs: the things the project delivers, such as trainings held or boreholes rehabilitated.
- Activities: what your team actually does.
- Indicators and targets: how you will know, with a baseline where possible. tools4dev advises making objectives specific, measurable, achievable, realistic and time-bound.
- Assumptions and risks: carried straight over from your theory of change.
Keep indicators few. A logframe with thirty indicators for a twelve-month grant is a reporting burden you will pay for later. Our M&E plan guide for small Kenyan NGOs shows how to choose and track them.
Common mistakes Kenyan NGOs make
- Treating activities as results. “Hold 20 workshops” is an output, not an outcome. Donors read the difference closely.
- Writing the theory of change last. Done after the budget, it becomes decoration.
- Hidden assumptions. If the plan only works when government releases funds on time, say so.
- Copying a template from a past grant. Different donors define impact and outcome differently; check their glossary.
If you are still shaping the pitch itself, our guides on writing a concept note and writing a grant proposal show where the logframe fits. For deeper reading, see INTRAC’s Theory of Change guide for small and diaspora NGOs (2013), still one of the clearest plain-language references available.
Frequently asked questions
Is a logframe the same as a results framework?
They are close cousins. Both set out objectives, outputs, outcomes and indicators. Donors use the terms differently, so follow the template in the call for proposals.
Can a small CBO skip the theory of change?
You can, but it helps. A one-page diagram with assumptions often makes the logframe quicker to write and the proposal easier to defend.
How long should a logframe be?
As short as the donor allows. One to two pages for a single grant is typical; more rows mean more to monitor and report.
Who should be in the room when you build a theory of change?
Programme staff, the people you serve, and ideally partners. INTRAC’s guide is clear that it should involve those the organisation exists to serve.
Does a theory of change replace monitoring and evaluation?
No. It gives monitoring and evaluation something to test. You still need indicators and data.